Illustrative exampleConstruction
A contractor with 30 machines and 12 site pickups
Fuel level sensors on the largest machines showed repeated night drains at one remote site. The site team changed the refueling process and added a guard. Engine hours also showed six machines with almost no use, which were moved to other projects instead of hiring more.
1,150 Ldrains detected in month one
AED 5,460fuel loss stopped per month
6underused machines redeployed
How we got there: 1,150 L × AED 4.75 = AED 5,462.
Illustrative exampleLogistics
A 40-truck distribution fleet on the Dubai to Abu Dhabi corridor
Supervisors received a daily idling summary and a weekly league table of drivers. Long idles at the two main loading bays were the first target. Average idling fell from 90 to 54 minutes per truck per day.
40%less idling per truck
1,870 Ldiesel saved per month
AED 8,890saved per month
How we got there: 40 trucks × 0.6 hours less idling × 3 L per hour × 26 days = 1,872 L × AED 4.75.